Place of Origin: | Shandong, China |
---|---|
Brand Name: | Changyue |
Certification: | CE, ISO9001:2008 |
Document: | Product Brochure PDF |
Packaging Details: | Export Film Packing / According To Customer |
Delivery Time: | 15 Days (1 - 1 Pieces) To Be Negotiated ( > 1 Pieces) |
Model NO.: | 65/132 | Automation: | Automatic |
---|---|---|---|
Computerized: | Computerized | Customized: | Customized |
Condition: | New | After-sales Service: | Site Installation |
Extruder Size: | 65/132 | Cavity: | Two Cavity / Four Cavity |
Pipe Diameter: | 16-50 Mm | Transport Package: | Export Package |
Specification: | 15-40 Mm | Trademark: | HLD |
Origin: | Qingdao, China | HS Code: | 84772090 |
Supply Ability: | 250 Kg/H | Warranty: | One Year |
Product Type: | PVC Pipe | Screw No.: | Double-screw |
Customization: | Available | Customized Request | Shipping Cost : | About Shipping Cost And Estimated Delivery Time. |
: | Initial Payment Full Payment | Currency: | US$ |
Return&refunds: | You Can Apply For A Refund Up To 30 Days After Receipt Of The Products. | ||
Highlight: | customized pipe extruder machine,computerized pipe extruder machine,customized plastic pipe extrusion machine |
four cavity PVC / CPVC electricity conduit pipe making machine / production line
four cavity PVC electricity conduit pipe making machine
PVC conduit pipe production line four cavity
PVC two cavity conduit pipe extrusion production line 16-50 mm
PVC DOUBLE PIPE EXTRUSION MACHINERY LINE
PVC double conduit pipe making machine
PVC double pipe extrusion line
Competitive Price for PVC UPVC pipes manufacturing machine/ PVC pipe production line/PVC pipes making machine
PVC CPVC UPVC pipes extrusion machine line
PVC pipe manufacturing production line/extruder machine
PVC pipes making machine line
pvc electric conduit pipe extruder machine
PVC electricity conduit pipe production line
Model | Pipe Diameter | Output | Max Speed | Motor | Total Length |
SJSZ-51/105 | 16-50 mm | 80-120 kg/h | 6 m / min*2 | 22 kw | 22m |
SJSZ-65/132 | 50 - 110 mm | 200-300kg/h | 8m/min*2 | 537kw | 23m |
1. After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine,
we will test the machines and send the sample to buyer.
2..After shipment, the seller will send one or two technicians to the buyer's factory to help the buyer install the machine and train
workers for buyer.
3. We will supply all electricity drawing, machine installation drawing.
4. When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays,
and other items which is easier broken.